WALTER OIL & GAS
PROJECT: MC 583 GOM January, 2005
18,600’ DYNAMIC UMBILICAL WITH 1" GAS LIFT LINE
2,787 Water Depth @ Tree
Tie Back to Host: Murphy Medusa SPAR
WALTER OIL & GAS
PROJECT: MC 837 GOM July, 2003
92,600 FT. DIRECT HYDRALIC UMBILICAL
Spooled Directly on to Lay Reel with Flowline at Freeport
Dockside Facility
ATP / BLUEWATER
PROJECT: L6 June, 2005
42 Kilometer (135,000 Ft.) Electro-Hydraulic Umbilical with
Fiber Optic Communication
Installation in Dutch Sector-North Sea
ATP / BLUEWATER
PROJECT: MC 711 "GOMEZ" GOM January, 2005
2 Dynamic Umbilicals with Lazy Wave Touch Down and
1" Gas Life Service Line
Two Well Tie Back to Converted Semi-Submersible
Floating Production Facility
ATP / BLUEWATER
PROJECT: HELVELLYN July, 2002
53,000 UK – NORTH SEA UMBILICAL
Shipped to Hartlepool, UK
Transferred to Stolt’s Seaway Falcon
W & T OFFSHORE
PROJECT: EW 977 "DICE" GOM September, 2004
41,500 FT. DIRECT HYDRAULIC UMBILICAL
Transpooled to Stolt’s Seaway Falcon On Board Carrousel at
Freeport Dockside Facility