Home
About Cabett
State-of-the-Art Manufacturing Facility
Product Delivery
Project Examples
Client List
Contact Us

WALTER OIL & GAS
PROJECT: MC 583 GOM January, 2005

18,600’ DYNAMIC UMBILICAL WITH 1" GAS LIFT LINE
2,787 Water Depth @ Tree
Tie Back to Host: Murphy Medusa SPAR

WALTER OIL & GAS
PROJECT: MC 837 GOM July, 2003

92,600 FT. DIRECT HYDRALIC UMBILICAL
Spooled Directly on to Lay Reel with Flowline at Freeport
Dockside Facility

ATP / BLUEWATER
PROJECT: L6 June, 2005

42 Kilometer (135,000 Ft.) Electro-Hydraulic Umbilical with
Fiber Optic Communication
Installation in Dutch Sector-North Sea

ATP / BLUEWATER
PROJECT: MC 711 "GOMEZ" GOM January, 2005

2 Dynamic Umbilicals with Lazy Wave Touch Down and
1" Gas Life Service Line
Two Well Tie Back to Converted Semi-Submersible
Floating Production Facility

ATP / BLUEWATER
PROJECT: HELVELLYN July, 2002

53,000 UK – NORTH SEA UMBILICAL
Shipped to Hartlepool, UK
Transferred to Stolt’s Seaway Falcon

W & T OFFSHORE
PROJECT: EW 977 "DICE" GOM September, 2004

41,500 FT. DIRECT HYDRAULIC UMBILICAL
Transpooled to Stolt’s Seaway Falcon On Board Carrousel at
Freeport Dockside Facility

Home About Cabett Manufacturing Facility Product Delivery Project Examples Client list Contact Us